i2i carried out our first operational runs in Trinidad over the weekend.

i2i carried out our first operational runs in Trinidad over the weekend.

i2i had a successful few days in Houston at the annual PPIM exhibition and conference. Lots of interest as always and some interesting jobs to look forward to.

Successfully inspected 55km of onshore pipeline

The SmartFoam looks worse for wear but we collected good inspection data for the full 31hrs operational run time in some challenging conditions.

Inspecting fuel offloading lines in Connecticut with SmartFoam tools and temporary launchers/receivers.

Pioneer tool inspecting low flow pipelines in the outback.

i2i built a 6inch multi-module Pioneer for a long duration pipeline in SEA. The tool had to pass through 140 x 1.5D bends.

A successful run in a 75km onshore condensate line. We inspected the pipeline twice in a 48hrs period.

Our first deployment into Argentina. Worked with a great team in an interesting location.

Sandy Lee and Franco showing off our 6″ and 8″ tools to potential investors at an MSP Investor Ladder.