i2i pipelines⚡ 

20181213 091237 resized

i2i’s 6inch multi module Pioneer

i2i built a 6inch multi-module Pioneer for a long duration pipeline in SEA. The tool had to pass through 140 x 1.5D bends.

20181213 073935 resized

Rapid Global Deployment

Mobilising inspection tools and teams worldwide

Minimal Operational Disruption

In-line inspections without shutdowns or downtime

End-to-End Insight & Assurance

From smart data collection to full integrity reporting

Trusted by Operators Worldwide

Reliable pipeline integrity solutions across all networks