The i2i Pioneer cleaned out 120kg of wax deposits and still came in with good inspection data for the pipeline. Integrated cleaning and inspection – the way forward.
120kg of Wax deposits and still good inspection data
Previous article
New 3inch Pioneer navigates 90 degree bends 