i2i pipelines⚡ 

p11 e1527940290855 1

6″ Pioneer for pig valve

i2i successfully ran a special build 6″ Pioneer through the Argus pig valves in Houston PRCI on Friday 1st June. This is the first inspection pig that can be launched and received through a pig valve of this size.

p10 p8

Rapid Global Deployment

Mobilising inspection tools and teams worldwide

Minimal Operational Disruption

In-line inspections without shutdowns or downtime

End-to-End Insight & Assurance

From smart data collection to full integrity reporting

Trusted by Operators Worldwide

Reliable pipeline integrity solutions across all networks